• FalseMyrmidon@kbin.run
    cake
    link
    fedilink
    arrow-up
    8
    ·
    7 months ago

    I mean disaster planning is about finding ways to mitigate things like power or internet going down to minimize or eliminate their impact. That said, accepting the risk of downtime because alternatives are too expensive is a perfectly valid decision as long as it’s an intentional one.

      • FalseMyrmidon@kbin.run
        cake
        link
        fedilink
        arrow-up
        3
        ·
        7 months ago

        Yeah, in which case you wouldn’t accept the downtime and would drop the cash on redundant systems.